薄涂环氧地坪的技术参数:
项目ITEM |
指标INDEX |
|
干燥时间,h Drying time,h |
表干TOUCH dry |
≤4 |
|
实干Hard dry |
≤24 |
粘接强度Mpa Adhesions,(with cement), Mpa |
≥2 |
|
邵氏硬度shore hardness |
≥80 |
|
耐冲击性㎏.cm impact strength,㎏.cm |
50通过50passed |
|
耐磨性(750g/500r,失重,g) Wearbility(750g/500r,weight loss,g) |
≤0.02 |
|
耐热性,150℃Heat-resistance,150℃ |
2h无变化No change in 2h |
|
耐水性Water-resistance |
48h无变化No change in 48h |
|
抗压强度,Mpa Campressive strength, Mpa |
≥70 |
|
抗弯强度,Mpa Flexible strength, Mpa |
≥6 |
|
拉伸强度,Mpa Tensile strength, Mpa |
≥7 |
|
耐NaCI,30% Anti- NaCI,30% |
13天无变化no change in 13days |
|
耐NaOH,10% Anti- NaOH,10% |
56天无变化no change in 56days |
|
耐H2SO4,10% Anti- H2SO4,10% |
56天无变化no change in 56days |
|
耐汽油,机油Anti- petrol |
56天无变化no change in 56days |
车间环氧树脂薄涂地坪施工方案:
(一)基层处理
1. 目的:清理地面,保证环氧树脂底漆与地面附着结实;
2. 施工工具:小型手持式打磨机,自吸打磨设备,铲除打磨机;
3. 施工方法:用打磨设备打磨铲除地坪不平整处、浮浆、油污及不平整地面,清理速度快,打磨处理施工结束后,依据地面情况对于含水率进行测试,可采用地坪测湿仪或依据专业人员的经验,将一块2m*2m的完整薄膜平铺在地面上,薄膜底部置干燥纸,四周密封。72小时后,取出干燥纸,若可点燃则可施工;不可点燃或断续则不可施工。对于含水率高的地面一般可采用高压火枪喷烤地面或用水性环氧底漆处理地面。
(二)、环氧树脂底漆施工
4. 目的:封闭素地,保证环氧树脂与地面附着结实;
5. 材料:(增强渗透型)环氧树脂底漆;
6. 施工工具:滚筒、钢质刮片、搅拌器等;
7. 施工方法:将环氧封闭底漆按配比充分搅拌,均匀涂在素地表面,24小时后施工修补层。
(三)、环氧中涂修补施工
8. 目的:使地面平整,无裂缝、凹坑等现象。保证承重层和面层的平整;
9. 材料:环氧树脂修补材;专用石英砂、石英粉
10. 施工工具:塑料刮片,钢质刮片、搅拌器等;
4.施工方法:将修补材按配比充分搅拌,把裂缝和不平整地面修补平整。
(四)、环氧树脂中涂层施工
11. 目的:加强地面的硬度和平整度,达到抗重压效果;
12. 材料:环氧树脂中涂材料、;专用石英砂、石英粉
13. 施工工具:专用抹刀、搅拌器等;
4. 施工方法:在修补层上施工配比好的环氧树脂中涂材料。固化后用专用打磨机打磨,使地面达到一定的平整度,去除中涂施工时留下的刮片印痕。
(五)、环氧树脂耐磨面层施工
14. 目的:满足使用要求,表达产品效果;
15. 材料:环氧树脂面涂;
16. 施工工具:专用滚桶、喷机、搅拌机等;
施工方法:将面层材按配比充分搅拌。用滚桶施工环氧面涂,经过36-72小时后,确认固化情况。